Posts

Showing posts from March, 2024

Blog 7

Image
  Blog 7  March 23, 2024  For the week of March 9-March 23, the tasks allocated for that period can be found below. Task 1: Meet with the VP of engineering at Sulzer to get the purchasing document reviewed and approved Task 2: Choosing a trip sensor design iteration and moving on with the design and machining process  Task 3: Create a written Mannuel that encompasses operation procedures and safety precautions while operating the OST test fixture  Task 4: Start Machining the Bearing housing and purchase all the required materials.  Task 1 outlines securing approval from the VP of engineering at Sulzer, which is imperative for the project's progression to the next stage of the design process. However, this task has proven arduous due to the challenges posed by the VP's demanding schedule and a lapse in communication. The team has attempted to set various meetings, however, the team is unable to get into contact and establish a time to meet with the VP of engineering. Seeing how