Blog 6
For the week of February 4th-February 17th, the tasks allocated for that period can be found below. Task 1: Re-do engineering drawings to add machining tolerances and datum Task 2: Provide a Purchase document to Sulzer for review and approval for bearings and seals Task 3: Provide a calculation document to the Sulzer engineer to verify our research and findings Task 4: Start machining the shaft diameter down to fit the deep grove ball bearing bore diameter concerning the tolerances In Task 1, the team made unexpected changes to the engineering drawing initially submitted to Sulzer engineers. Following feedback on the bearing housing and shaft engineering drawing, it was noted that machining tolerances needed inclusion. The edited drawings, as illustrated in Figure 1-3, were subsequently submitted for Sulzer engineers' approval. Additionally, modifications were made to the bearing housing geometry to simplify the machining process. Once the revised drawings were s...